This is the discussion that will deal exclusively with the shelter and tree house construction project.
Here is the people confirmed for the team:
- Alex Hernandez
- Karina Santos
- Phili Vannatter
- Thonas Collins
- Eddie Motto
- Rosario Silva
- Anthony Ruacho
- Austin Blassingame
- Sebastian Muralles
- Anthony Lockett
- Intern Assistant: Pamela chacaltana
- Project Coordinators: Mr. Grady, Mr. Chapman, Teo Alfero
Tags:
WEEK 1: we were supposed to think about and post our thoughts regarding what we are going to build and how will the construction project look like. Her are the options:
OPTION 1: BUILD THE THIRD LEVEL ON THE EXISTING STRUCTURE
Here is a sketch I prepared on how it could look like:
OPTION 2: BUILD A ROPE BRIDGE
Here are two professionally built bridges
OPTION 3: START A WHOLE NEW STRUCTURE AROUND A NEW TREE
THOUGHT? ...
WEEK 2
Team, we have agreed on first building three wolf houses for Kyra, Shade, and the kindergarten kennel. We then are going to install the sheet metal roofing on Shade's kennel and the kindergarten kennel.
Second, we are going to build a suspended rope bridge connecting the zip line platform to the second level of the tree house.
Lastly, if we have the time, and only IF we have the time ... we are going to build the third level of the three house.
ASSIGNMENT:
First, think of designs of all the projects we are doind and post your thoughts on this conversation.
Second, research videos on YouTube on the correct use of the following tools:
- Chop Saw
- Skill Saw
- Power Screw Driver
- Nail Gun
- Chain Saw
- Framing Hammer
- Angle
REMEMBER, All the assignments are due no later than Tuesday at midnight.
I LOOK FORWARD TO SEEING YOU NEXT THURSDAY
PLEASE DON'T GET IN TROUBLE SO YOU CAN COME
Teo
i like the second bridge design it looks the most interesting
|
||